The Best Aso Villa References. Upon completion of the aso rock. The aso rock presidential villa encompasses the 400 meter nonolith aso rock and is located within the three arms zone of the abuja metropolis.
Upon completion of the aso rock. The aso rock villa was completed in 1991. The aso rock presidential villa encompasses the 400 meter nonolith aso rock and is located within the three arms zone of the abuja metropolis.
The Aso Rock Presidential Villa Encompasses The 400 Meter Nonolith Aso Rock And Is Located Within The Three Arms Zone Of The Abuja Metropolis.
When was aso rock villa built. Upon completion of the aso rock. The aso rock presidential villa took about 2 years to build.
Construction Of The Villa Started On October 13Th, 1989, And Ended On.
The aso rock villa was completed in 1991. In 1991 the aso rock presidential villa was completed and president babangida became the first head of state to occupy it, moving in on december 12, 1991. Aso villa (officially the aso rock presidential villa) is the workplace and official residence of the president of nigeria since 1991 when nigeria moved its capital from lagos to abuja.
0 komentar:
Posting Komentar